停車棚鋼梁安裝過(guò)程
Installation process of steel beam of parking shed
裝配式輪胎骨架生產(chǎn)→鋼梁裝配→鋼梁焊接→焊縫探傷→焊縫補(bǔ)漆→鋼梁裝配→測(cè)量校正→焊接。
Fabricated tire frame production → steel beam assembly → steel beam welding → weld flaw detection → weld repair → steel beam assembly → measurement and correction → welding.
分段鋼梁長(zhǎng)度適中時(shí),由履帶完成安裝,點(diǎn)設(shè)在鋼梁1/3分段點(diǎn)處。
When the length of the segmented steel beam is moderate, the installation is completed by the crawler, and the installation point is set at the 1 / 3 segmented point of the steel beam.
裝配完成后,鋼梁跨度比較大,用兩個(gè)履帶吊起,設(shè)置4個(gè)點(diǎn),保證裝配力方向的延長(zhǎng)線與1/鋼梁的3段點(diǎn)。
After assembly, the span of the steel beam is relatively large. Lift it with two crawlers and set four points to ensure that the extension line in the direction of assembly force is consistent with the three section points of 1 / steel beam.
確定鋼梁的安裝位置和方向后,將梁慢慢下放到安裝點(diǎn),使梁穩(wěn)定就位。橫梁與牛腿對(duì)正后,用沖釘臨時(shí)定位定心,對(duì)正橫梁兩端。擰緊拉直,臨時(shí)擰緊節(jié)點(diǎn)兩側(cè)的螺栓。
After determining the installation position and direction of the steel beam, slowly lower the beam to the installation point to stabilize the beam in place. After the beam is aligned with the bracket, use punch nails to temporarily locate and center, and align both ends of the beam. Tighten and straighten, and temporarily tighten the bolts on both sides of the node.
停車棚鋼梁生產(chǎn)工段
Steel beam production section of parking shed
根據(jù)現(xiàn)場(chǎng)安裝要求,鋼梁生產(chǎn)分為3個(gè)生產(chǎn)工段。
According to the site installation requirements, the steel beam production is divided into three production sections.
先制作板加區(qū)的X1線,包括11根車梁、13根立柱和屋頂托梁等,約6T。加熱爐,梁42根(其中Q345C14根,Q235B28根),立柱、頂梁、支架、檁條等32根。板內(nèi)有車梁55根、立柱39根和頂梁、支架、檁條等加區(qū)域(X1軸除外)。鋼柱上柱為H型實(shí)腹式,下柱為雙臂分離式,肩梁采用單腹板形式。
First, make X1 line of slab processing area, including 11 vehicle beams, 13 columns and roof joists, about 6T. Heating furnace, 42 beams (including q345c14 and q235b28), 32 columns, top beams, supports and purlins. There are 55 car beams, 39 upright columns, top beams, supports, purlins and other additional areas in the plate (except X1 axis). The upper column of the steel column is H-shaped solid web type, the lower column is double arm separated type, and the shoulder beam adopts the form of single web.
上下立柱設(shè)有K型管支撐,柱腳為獨(dú)立柱腳。轎廂梁跨度為H型截面實(shí)腹型15M、18M、24M、27M,梁高2M、2.2M、2.5M、2.8M、3M。車梁與水平制動(dòng)梁、輔助桁架和下部水平支撐構(gòu)成一個(gè)整體。屋面梁采用H型實(shí)心腹梁,間距42M,大柱間距處加托梁。
The upper and lower columns are provided with K-shaped pipe support, and the column base is an independent column base. The car beam span is H-section solid web type, 15m, 18m, 24m and 27m, and the beam height is 2m, 2.2M, 2.5m, 2.8m and 3M. The vehicle beam is integrated with the horizontal brake beam, auxiliary truss and lower horizontal support. The roof beam adopts H-shaped solid web beam with a spacing of 42m, and joists are added at the spacing of large columns.
此外,如果濟(jì)南停車棚想要長(zhǎng)年使用的話,建議不要因?yàn)橄牍?jié)約一點(diǎn)成本而購(gòu)買一些低質(zhì)量的膜材料。膜壞是可以再換,但是期間換膜的成本和人工費(fèi),不膜結(jié)構(gòu)車棚質(zhì)量會(huì)大打,而且還會(huì)浪費(fèi)很多工程費(fèi)用。也不需要購(gòu)買貴的材料,如果膜材料質(zhì)量相差不大的的話,建議購(gòu)買相對(duì)較低的那。
In addition, if Jinan parking shed wants to be used for a long time, it is recommended not to buy some low-quality membrane materials because you want to save a little cost. If the membrane is broken, it can be replaced again, but the cost and labor cost of replacing the membrane during the period will not only affect the quality of the membrane structure shed, but also waste a lot of engineering costs. There is no need to buy expensive materials. If the quality of membrane materials is not different, it is recommended to buy the one with lower relative price.
要避免購(gòu)買到偽膜材料,膜材樣品,在膜材料運(yùn)工地少要派一個(gè)自己的人到現(xiàn)場(chǎng)監(jiān)督。準(zhǔn)備施工驗(yàn)收的時(shí)候,和車棚的膜結(jié)構(gòu)公司要膜材料的質(zhì)檢報(bào)告。
To avoid purchasing false membrane materials and membrane samples, at least one person shall be sent to the site for supervision when the membrane materials are transported to the construction site. When preparing for construction acceptance, ask the membrane structure company of the shed for the quality inspection report of membrane materials.
本公司是一家集雨棚、停車棚、遮陽(yáng)棚等產(chǎn)品設(shè)計(jì)生產(chǎn)安裝服務(wù)為一體的公司。公司經(jīng)過(guò)潛心研究,吸收行業(yè)經(jīng)驗(yàn),開發(fā)出各類高水平鋼結(jié)構(gòu)。更多相關(guān)內(nèi)容就來(lái)我們網(wǎng)站m.wuchenju.com.cn關(guān)注咨詢了解吧!
The company is a company integrating the design, production and installation services of canopy, parking shed, sunshade and other products. After painstaking research and absorbing industry experience, the company has developed all kinds of high-level steel structures. For more information, please visit our website at m.wuchenju.com.cn Com follow the consultation to understand!
此文關(guān)鍵詞:Array Array Array Array
閱讀/ Recommended reading
- 菜市場(chǎng)推拉雨棚需要安裝軌道嗎 2025-01-15
- 推拉雨棚的材質(zhì)選擇需要考慮哪些因素呢 2025-01-07
- 伸縮蓬是一種具有多種功能和應(yīng)用場(chǎng)景 2024-12-15
- 伸縮棚的材質(zhì)選擇較為豐富 2024-12-09
推拉雨棚有哪些常見的安裝方式呢
[2018-08-23]
推拉雨棚的安裝方式通常根據(jù)其結(jié)構(gòu)設(shè)計(jì)和使用場(chǎng)景的不同而有所差異,但總體來(lái)說(shuō),常見的安裝方式可以歸納為以下幾個(gè)步驟: The installation method of pu...