山東蘭天篷膜安裝工程有限公司
聯(lián)系人:張經(jīng)理
電話(huà):15064156568
網(wǎng)址:http://m.wuchenju.com.cn
地址:山東省濟(jì)南市市中區(qū)建設(shè)路99-5號(hào)一層?xùn)|戶(hù)
濟(jì)南膜結(jié)構(gòu)車(chē)棚建設(shè)技術(shù)介紹
一、在安裝膜結(jié)構(gòu)時(shí),應(yīng)嚴(yán)格按照固定程序進(jìn)行。膜結(jié)構(gòu)的安裝由三部分組成。一是展開(kāi),二是固定,三是成型,這個(gè)順序是不能顛倒的。
1、 When installing membrane structures, the fixing procedures should be strictly followed. The installation of membrane structures consists of three parts. The order of unfolding, fixing, and forming cannot be reversed.
二、與其他建筑材料相比,膜結(jié)構(gòu)仍然比較脆弱,在安裝過(guò)程中必須在其表面上進(jìn)行操作。為了避免造成傷害,需要在膜表面設(shè)置一層網(wǎng),其次是要求施工人員穿上較軟的鞋子。
2、 Compared with other building materials, membrane structures are still relatively fragile and must be operated on their surface during installation. To avoid injury, it is necessary to first set up a safety net on the surface of the membrane, and then require construction personnel to wear softer shoes.
三、安裝膜結(jié)構(gòu)時(shí)必須考慮到天氣條件,比如比較苛刻的條件,比如風(fēng)力較大,施工時(shí)要停,待天氣再次變好后再做。由于風(fēng)力大,膜面及其下方的支柱容易產(chǎn)生震顫,影響施工效果和人員。
3、 When installing membrane structures, weather conditions must be taken into consideration, such as harsh conditions such as strong winds. Construction must be stopped until the weather improves again before proceeding. Due to strong wind, the membrane surface and the pillars below are prone to vibration, which affects the construction effect and personnel safety.
四、必須對(duì)已經(jīng)建成的膜表面采取保護(hù)措施,以防止在進(jìn)行其他工作時(shí)損壞原來(lái)的項(xiàng)目。
4、 Protective measures must be taken on the surface of the already built membrane to prevent damage to the original project during other work.
五、由于膜結(jié)構(gòu)具有良好的拉力,不同的建筑物需要不同程度的張力,所以應(yīng)在施工前建造。確定拉力的大小,并在后期施工時(shí)進(jìn)行更嚴(yán)格的控制。
5、 Due to the excellent tensile strength of membrane structures, different buildings require varying degrees of tension, so they should be constructed before construction. Firstly, determine the magnitude of the tensile force and implement stricter control during later construction.
六、對(duì)于膜結(jié)構(gòu)停車(chē)棚的一些裝配工作,我們必須嚴(yán)格按照工藝標(biāo)準(zhǔn)進(jìn)行。如果主連接器尚未安裝,則必須用堅(jiān)固的壓力繩固定,以防止建筑物晃動(dòng)。
6、 For some assembly work of the membrane structure parking shed, we must strictly follow the process standards. If the main connector has not been installed, it must be secured with a sturdy pressure rope to prevent the building from shaking.
本文由濟(jì)南停車(chē)棚,為您提供,我們的網(wǎng)站是:http://m.wuchenju.com.cn我們將以全心全意的熱情為您提供服務(wù),歡迎您的訪問(wèn)!
This article is provided by Jinan Parking Shed. Our website is: http://m.wuchenju.com.cn We will provide you with wholehearted enthusiasm and welcome your visit!
閱讀/ Recommended reading
- 菜市場(chǎng)推拉雨棚需要安裝軌道嗎 2025-01-15
- 推拉雨棚的材質(zhì)選擇需要考慮哪些因素呢 2025-01-07
- 伸縮蓬是一種具有多種功能和應(yīng)用場(chǎng)景 2024-12-15
- 伸縮棚的材質(zhì)選擇較為豐富 2024-12-09
推拉雨棚的安裝方式通常根據(jù)其結(jié)構(gòu)設(shè)計(jì)和使用場(chǎng)景的不同而有所差異,但總體來(lái)說(shuō),常見(jiàn)的安裝方式可以歸納為以下幾個(gè)步驟: The installation method of pu...