聯(lián)系我們
山東蘭天篷膜安裝工程有限公司
聯(lián)系人:張經(jīng)理
電話:15064156568
網(wǎng)址:http://m.wuchenju.com.cn
地址:山東省濟(jì)南市市中區(qū)建設(shè)路99-5號(hào)一層?xùn)|戶
推拉蓬工程在陰雨天氣施工的事項(xiàng)
來源:http://m.wuchenju.com.cn/ 日期:2022-09-24 發(fā)布人:
濟(jì)南推拉蓬結(jié)構(gòu)工程施工過程中,有時(shí)會(huì)遇到陰雨天氣。雨天施工應(yīng)注意哪些事項(xiàng),確保施工呢?讓我們一起來看看吧。
During the construction of Jinan sliding roof structure project, rainy weather is sometimes encountered. What should be paid attention to during construction in rainy days to ensure safe construction? Let's have a look.
1.在雨天施工時(shí),應(yīng)設(shè)置臨時(shí)避難所。雨不應(yīng)落在熱焊縫上。如焊接處潮濕,需在焊接前用干布擦拭,并用氧乙炔火焰擦拭,以保持焊接處干燥,無殘留濕氣。
1. Temporary shelters shall be provided for construction in rainy days. Rain shall not fall on hot welds. If the welding place is wet, it shall be wiped with dry cloth and oxyacetylene flame before welding to keep the welding place dry and free of residual moisture.
2.吊裝過程中,若部件上有積水,應(yīng)在安裝前,但不得損壞涂層。安裝高強(qiáng)度螺栓接頭時(shí),部件的摩擦面應(yīng)清潔,無水滴,不得接觸雨水、污垢、油污等污物。
2. During hoisting, if there is water on the parts, it shall be removed before installation, but the coating shall not be damaged. When installing high-strength bolt joints, the friction surfaces of the components shall be clean, free of water drops, and shall not be exposed to rain, dirt, oil and other contaminants.
3.濟(jì)南推拉蓬結(jié)構(gòu)工程構(gòu)件不能在雨天涂裝。
3. The structural components of Jinan Sliding Canopy cannot be painted in rainy days.
4.濟(jì)南推拉蓬不得在雨天和5級(jí)以上大風(fēng)天氣施工。
4. Jinan sliding awning shall not be constructed in rainy days or windy weather above level 5.
5.雨天,由于空氣潮濕,焊條應(yīng)存放在防潮烘烤中。同一覆蓋電極重復(fù)烘烤次數(shù)不得超過兩次,管理人員應(yīng)及時(shí)做好烘烤記錄。
5. On rainy days, due to the humid air, the welding rods should be stored in the damp proof baking. The repeated baking times of the same covered electrode shall not exceed two times, and the management personnel shall timely make baking records.
6.推拉蓬工程在雨天和大風(fēng)天氣工作時(shí),對(duì)柱、主梁、支座等大型構(gòu)件應(yīng)立即進(jìn)行修正,位置修正后應(yīng)立即進(jìn)行固定,防止單側(cè)失穩(wěn)。當(dāng)天安裝的組件應(yīng)形成空間穩(wěn)定體系。
6. When the sliding roof works in rainy and windy weather, the column, main beam, support and other large components shall be corrected immediately, and fixed immediately after the location correction to prevent unilateral instability. Components installed on the same day shall form a space stability system.
此外要檢查推拉蓬裝置的安裝情況。作為濟(jì)南推拉蓬支架的基礎(chǔ)設(shè)施,各單元需要我們仔細(xì)檢查膜單元的邊界與附著結(jié)構(gòu)是否連接正確。
In addition, check the installation of the sliding roof device. As the infrastructure of Jinan sliding roof support, each unit requires us to carefully check whether the boundary of the membrane unit is correctly connected to the attachment structure.
制造過程中的材料和粘貼痕跡要清晰,各種施工區(qū)域和精度要達(dá)到相關(guān)標(biāo)準(zhǔn),這樣膜單元才能更好的連接,從而使整體結(jié)構(gòu)更加完善。更多相關(guān)事項(xiàng)就來我們網(wǎng)站http://m.wuchenju.com.cn咨詢了解吧!
The material and pasting traces in the manufacturing process should be clear, and the various construction areas and precision should meet the relevant standards, so that the membrane units can be better connected and the overall structure can be more perfect. Come to our website for more information http://m.wuchenju.com.cn Ask and understand!
下一篇:推拉棚廠家如何判斷如何選擇 上一篇:汽車停車棚的定制有什么要求
此文關(guān)鍵詞:Array Array Array Array
閱讀/ Recommended reading
- 菜市場(chǎng)推拉雨棚需要安裝軌道嗎 2025-01-15
- 推拉雨棚的材質(zhì)選擇需要考慮哪些因素呢 2025-01-07
- 伸縮蓬是一種具有多種功能和應(yīng)用場(chǎng)景 2024-12-15
- 伸縮棚的材質(zhì)選擇較為豐富 2024-12-09
推拉雨棚有哪些常見的安裝方式呢
[2018-08-23]
推拉雨棚的安裝方式通常根據(jù)其結(jié)構(gòu)設(shè)計(jì)和使用場(chǎng)景的不同而有所差異,但總體來說,常見的安裝方式可以歸納為以下幾個(gè)步驟: The installation method of pu...